Projects
Currently, we are in the process of installing a 5.5 MWp photovoltaic system on the roofs of four CTP halls.
The main purpose of this system is to generate electricity to power the buildings owned by the respective investors.
Investor: CTP Invest s.r.o.
PV Park Barby
1,3 MWp
Installation of photovoltaic panels, including a transformer station.
Investor: Uwe Maiberg
Project location: MonplaisirstraBe, D-39249 Barby
PV Roof Žatčany Brno
Installation of 5,488 YINGLI SOLAR 230 Wp solar panels.
Investor: EPL Solar s.r.o.
Project location: Žatčany, Brno-venkov district.
1 MWp
VCT Dent
67,23 kWp
Installation of 30 bifacial panels with a capacity of 585 Wp and 108 monocrystalline panels with a capacity of 460 Wp in the premises of VCT Dent.
The installation includes inverters, necessary power components, required protections, basic monitoring at the inverter level, and a battery storage system.
Investor: REST-MJB s.r.o.
Project location: Náchodská ul. 3204, 390 03 Tábor
PV Park Otín
Installation of 9,906 TIANWEI SOLAR 230 Wp solar panels, including a transformer station.
Investor: Otín Green Power s.r.o.
Project location: Otín u Jindřichova Hradce
2,12 MWp
VZLU Letňany
312,6 kWp
Installation of 687 solar panels on the roof of building. The installation includes equipment to convert the solar power, necessary components to manage the power, required safety measures, and basic monitoring at the inverter level, and dispatch control by PRE.
Investor: Výzkumný a zkušební letecký ústav, a.s.
Lokalita projektu: Beranových 130, 199 00 Praha, Letňany
Retail Park Bucharova
Installation of 353 FV panels with a capacity of 280Wp on the building's roof, along with inverters, power components, protections, basic monitoring at the inverter level, and a battery storage system.
99 kWp
Investor: RP Bucharova, s.r.o.
Project location: Retail Park Bucharova, Bucharova 1314/8, 158 00 Praha 13-Stodůlky
PV Roof Deva Nutrition
Complete engineering and implementation of the PV-power plant.
Realisation: 2023
Project Location: Nové Město nad Metují
468 kWp
PV Roof Vitesco 1. Stage
Complete engineering and implementation of the PV-power plant.
Investor: Vitesco Technologies Czech Republic s.r.o.
Project location: Frenštát pod Radhoštěm
320 kWp
SOŠ Jarov
Installation of 82 solar panels with a capacity of 460Wp and 81 solar panels with a capacity of 285Wp on the roof of building SO 01, includes inverters, power components, protections, monitoring at the inverter level, and a battery storage system.
110 kWp
Investor: SOŠ stavební a zahradnická
Project location: Učňovská 100/1, 190 00 Praha 9
P3 Mstětice
The installation of solar panels is currently underway on two buildings of company P3 in Mstětice. Building CD03 will have 1,090 panels installed with a total capacity of 533 kWp, while building DC05 will have 694 panels with a capacity of 340 kW.
533+340 kWp
Update: In the construction phase
Project location: P3 Logistic Parks - Mstětice, 250 91
Brno CPI areál Tesla
119kWp
Update: In the construction phase
Project location: Brno
PV Park Radkyně
4,8MWp
Update: In the construction phase
Project location: Radkyně
PV Roof IGY Č. Budějovice
Installation of a photovoltaic system on the roof of the IGY shopping center in České Budějovice.
570kwp
Update: In the construction phase
Project location: České Budějovice
PV & solar Facade Prague
Installation of solar facades and a photovoltaic system (PV system) on the roof of the MŠ Gercenova complex in Prague 15.
Update: In the construction phase
Investor: MČ Praha 15
Project location: Gercenova, Praha 15